What do I need to give the Board to have an ANR plan approved?
You will need to bring the following to a Planning Board meeting:
- A completed application
- Six (6) copies of your plans showing everything required in the Zoning Bylaws. These plans must be stamped by a registered architect, landscape architect or professional engineer and a professional land surveyor.
- A check for the amount of $50 for each new building lot.
Make sure all information reflects what is asked for in Brimfield Zoning Bylaws.